Indonesia 1 Twin Towers Project

Visits : Release time :2017-12-28

With a building area of 306,000 square meters, a building height of 303 meters, 7 underground floors, 59 floors above the ground, an excavation depth of 26.77 meters, and a local excavation depth of 32.2 meters, this Project belongs to a super high-rise and ultra-deep foundation pit project. The important and difficult points in the project management are: plane planning management, schedule management, deepening design management, integration of Chinese and Indonesian technologies, and integration of local resources.

This Project actively studies local practices in Indonesia, and at the same time introduces domestic advanced technologies and sums up the characteristic construction technologies applicable to Indonesia.

Reverse process jump-layer excavation technology: to increase the depth of a single excavation, excavate a two-floor structure construction space at a time, and make the construction of one layer of the structure not occupy the key route, the B2 and B3 layers of this Project adopt the jump-layer excavation technology to remove the pouring of the B2 floor from the key route, and the construction period is effectively shortened by about 52 days.

 

Reverse process jump-layer excavation technology

Soil formwork method construction technology: The excavated soil is used as a natural formwork. After the cushion is poured and the isolation layer is laid, the reinforcing steel is tied and the concrete of the structural floor is poured. Through the application of the soil formwork method, the investment in the floor slab formwork is saved, and the construction period is shortened by about 10 days compared to the conventional formwork construction.

 

Soil formwork method construction technology

Green quick removal system application: Green early removal formwork consists of the steel frame wood formwork panel and the upright tube with the early removal member, which is easy to operate and easy to turn over. Due to the simple operation of the formwork system, the efficiency of the formwork construction is effectively improved, and because it is an early removal system, the one-time input of the formwork is reduced.

 

Green quick removal system application

Chute method construction technology: the bracket and a set of articulated chutes are used to form an articulated chute system to accelerate the concrete pouring speed.

 

Articulated chute method construction technology

BIM technology: The BIM technology is used to conduct the plane layout and simulate the vehicle passing to avoid impeding on-site traffic due to the improper location of material yards. When the on-site operating conditions change, the BIM model is updated in time to ensure that the plane layout is reasonable and feasible. In addition, the BIM technology is used for collision detection, BIM model and animation clarification, project volume calculations and other functions to ensure the operation of the project.

 

BIM technology application


Project aerial view

国产精品一区91| 日韩视频高清无码流出一区| 无码AV鲁丝片一区| 国产呦精品一区二区三区下载 | 精品国产精品国产自在久国产 | 国产一区二区三区自拍| 18岁禁止一区西西人体瓣开视频| 亚洲主播精品无码一区二区| 日韩乱伦片国产乱伦| 亚洲无码100页| 午夜成人内射观| 香蕉久久夜色新超碰青青吃| 亚洲无码对话视频| 青青在线加勒比精品综合在线观看| 国产91中日日韩理论无码| 凹凸精品网站| 亚洲无码对话视频| 精品综合亚洲色一色av蜜芽| 亚瑟成人AV| 久草热在线精品视频| 欧美亚洲交换国产精品国产区 | 日韩精品岛国| 国产一区二区三区AV在线k8| 97韩国碰碰| 夜夜夜少妇夜夜爽| 亚洲精品少妇高清自慰| 亚洲综合激情一区播放| 久草综合精品| 亚洲性爱激情网| 自拍亚洲欧美青青草小视频| 制服丝袜三级凹凸视频| 亚洲另类性视频| 艾草午夜爱爱视频| 成年人影院桃色一区| 日本视频亚洲色| 婷婷五月丁香精品在线| 少妇中文字幕在线三级片| 欧美日韩亚洲国产综合变态另类| 国产丝袜在线| 黄网免费一区| 蜜臀AⅤ国产精品久久久国产老师|